pri_image_case-study-1.jpg

A Massachusetts City Municipality

System Size: 285,000 liters per day

Installation Date: June 2017

Total Run-time: 150 days; ongoing (stopped in winter)

Input Water: Phosphates .14 MG/ L, 124 TDS

Output Water: Phosphates: .03 MG/L  26 TDS

Recovery Rate: > 99%


Based on the successful pilot, Phoenix earned certification by the Massachusetts Clean Energy Center as a Commercially Ready Technology