In early 2017, Phoenix engaged in a pilot with a water solutions provider in Pennsylvania. The goal of the pilot was to gather the necessary data to submit for an operational permit in the state. The pilot exceeded the clients expectations and they have signed an LOI for multiple 1M LPD systems.

pri_image_case-study-2.jpg

Oil & Gas Sector

System Size: 95,000 liter per day

Installation Date: March 2017

Total Run-time: 274 days

Input Water: 55,000 to 100,000 TDS

Output Water: <500 TDS

Recovery Rate: 50 to 60%


Based on the successful pilot, Phoenix earned a letter of intent for 10 1M liter per day systems